CASE STUDIES

Heavy Engineering

Large-scale engineering and heavy mechanical work — executed to perfection.

High speed mill
High speed mill
High speed mill
High speed mill
High speed mill
1 / 6

01 / 03

High Speed Mill

Reiter Morando HSR maintenance.

  • 440 mm bearing changes and setup.
  • Advanced manual adjustment and re-setup of the machine.
  • Advanced hydraulic fault-finding and resolution.
MMD sizers
1 / 1

02 / 03

MMD Sizers

MMD sizer maintenance.

  • Full segment change.
  • Barrel welding and maintenance.
  • Scraper / flight-conveyor full replacement in under 12 hours.
  • Feeder shafts, sprockets and gearbox replacements.
  • Crusher-box welding and modifications.
  • Fluid-drive replacements.
Grinding mill
Grinding mill
Grinding mill
1 / 3

03 / 03

Grinding Mill

JC Steel / Craven Fawcett grinding mills.

  • Standard maintenance (dead plates, shells, grids).
  • Wheel shafts and bearing replacement.
  • Gearbox changes.
  • Footstep bearing replacement.
  • Upgrading the scraper system to be hydraulically powered.