CASE STUDIES
Heavy Engineering
Large-scale engineering and heavy mechanical work — executed to perfection.
01 / 03
High Speed Mill
Reiter Morando HSR maintenance.
- 440 mm bearing changes and setup.
- Advanced manual adjustment and re-setup of the machine.
- Advanced hydraulic fault-finding and resolution.
02 / 03
MMD Sizers
MMD sizer maintenance.
- Full segment change.
- Barrel welding and maintenance.
- Scraper / flight-conveyor full replacement in under 12 hours.
- Feeder shafts, sprockets and gearbox replacements.
- Crusher-box welding and modifications.
- Fluid-drive replacements.
03 / 03
Grinding Mill
JC Steel / Craven Fawcett grinding mills.
- Standard maintenance (dead plates, shells, grids).
- Wheel shafts and bearing replacement.
- Gearbox changes.
- Footstep bearing replacement.
- Upgrading the scraper system to be hydraulically powered.








